Power Plant of Pont-sur-Sambre
This set reports measures performed on the 120 MW gas power plant of Pont-sur-Sambre. The original data have been obtained with a sampling interval of 10.24 seconds; every subset of 6 samples has been substituted with their mean value leading to an equivalent sampling interval of 61.44 seconds.
The mean value has been subtracted from the samples which refer to:
  • Gas flow
  • Turbine valves opening
  • Super heater spray flow
  • Gas dampers
  • Air flow
  • Steam pressure
  • Main steam temperature
  • Reheat steam temperature
Source: Dr. J.E.N. Richalet (IFAC identification test case)
Reference: R.P. Guidorzi, On the use of minimal parametrizations in multivariable ARMAX identification, 13th IFAC World Congress, S. Francisco, July 1996.
Download
Plot
Home Page Process Data